Decide What Can Remain
A lower residual water level reduces the final cleanup. It does not mean the floor will be completely dry.
LOW-LEVEL DRAINAGE
For the final stage of clean-water removal. Compare residual-water levels, starting conditions and control options before choosing a model.

Models
Check the water limits, controls and power options for each model.

QDX-PT · Clean water
Compact clean-water transfer, with a 7 mm residual water level and manual control.

QDX-PH · Clean water
Bottom-suction clean-water drainage, with a published 7 mm residual water level.

QDX-PA · Clean water
Five power options for clean water, with top-cover and base choices for OEM projects.

QDX-PP · Clean water
Compact bottom-suction clean-water transfer, with a 10 mm residual level.

QDX-SC · Clean water
Clean-water pumping with a 304 stainless steel housing and top discharge.
Before You Choose
Use these points to compare the water, installation and operating requirements before choosing a model.
A lower residual water level reduces final cleanup but does not leave the floor completely dry. Check starting level, stopping method and the selected model’s operating instructions.
A lower residual water level reduces the final cleanup. It does not mean the floor will be completely dry.
The water needed to start pumping can differ from the level a running pump can drain down to.
Manual operation and automatic level controls behave differently. Use the selected model’s instructions.
Explore the final stage of pool, tank and clean-water floor drainage. Remove debris before considering a clean-water low-level model.
Key Applications
Application suitability depends on the liquid, solids, required duty point, installation/control method and exact product configuration.
Low-level finishing where water chemistry and debris remain within the selected clean-water model limits.
Explore applications ↗Choose by required transfer flow and the residual-water level that may remain at the end.
Explore applications ↗Use low-level clean-water families for final cleanup after bulk floodwater and debris have been removed.
Explore applications ↗Shallow clean-water cleanup where residual-water target and control method are part of the selection.
Explore applications ↗Common Questions
No. The listed clean-water models leave a residual water level of 7 or 10 mm under the applicable conditions. Some final cleanup may still be needed.
No. Residual level, starting level and automatic switching levels are different values. Check the selected model and operating method.