Confirm the Product
Identify the model, power rating, electrical version and components for the order.
QUALITY CONTROL
The agreed model and electrical configuration guide inspection, applicable testing and the documents supplied with each order.
Compliance documents available: CE-related LVD and EMC reports, RoHS test evidence, CB / IECEE certification and ISO 9001 documentation are available for applicable products. We confirm applicability for the selected model and electrical version before supply.

Inspection Principle
Confirm the ordered product, define acceptance points, agree on the evidence and use documents that match the supplied version.
The exact checks and records depend on the model, electrical version, construction and destination market.

Inspection Planning
Confirm the product, acceptance criteria, evidence and applicable documents before production begins.
Identify the model, power rating, electrical version and components for the order.
Agree on the performance, construction, appearance and packing requirements that matter to the project.
Identify the inspection records, test reports or third-party checks requested.
Use files that apply to the supplied model, version and destination market.
Inspection Plan
The exact checks, sampling and records are agreed for the project.
| Area | What to check | How it is confirmed |
|---|---|---|
| Electrical Requirements | Supply, cable, plug and specified electrical checks | Match to ordered version |
| Construction and Components | Assembled product versus agreed component and construction specification | Check against approved specification |
| Appearance and Identification | Finish, color, logo, labels and nameplate content | Check against approved sample / artwork |
| Packing | Supplied contents, box, inserts, barcodes and shipping labels | Check against packing requirements |
| Documents | Applicable reports, certificates and product files requested for the order | Match exact model and version |
Certification and test-document applicability varies by model, electrical version, standard and market. Confirm the relevant document set before the order is finalized.
Product Documents
Available documentation may include CE-related LVD and EMC reports, RoHS test evidence and CB/IECEE certificates within the applicable product scope. Confirm the files for the exact model and electrical version you plan to supply.
From Quote to Order
Keep the selected product, approved sample, inspection criteria and supplied documents tied to the same order specification. If a component or electrical version changes, review the related checks and files too.
Explore manufacturing ↗Confirm documents for the exact model, electrical version and destination market.
Quality FAQ
No. Document scope can depend on the model, power and electrical version, construction and market. Ask for the applicable files for your selected product.
Tell us the records and acceptance criteria you need. Availability, sampling and any additional checks are agreed for the project.
Different versions can have different ratings and approval scopes. Use documents for the product you plan to supply, rather than assuming a similar model is covered.
Yes, a buyer or third-party plan can be reviewed. Agree on checks, sampling, criteria and records before production.